Illinois · MISO

Collins

85.7
Composite
PrimeClears the power gateBest-fit: Reuse · readiness 9473% confidence

Former generating station with full power availability, competitive wholesale cost, and abundant cooling water. Clears the power gate outright, a clean Prime reuse.

  • Ample reusable interconnection headroom on an existing site.
  • Existing interconnection with a low queue backlog.
  • High-voltage line on-site or adjacent.
Verified signals · every claim sourced
Existing grid interconnectionyes
federal energy data
Former plant nameplate2,650 MW
federal energy data
Nearest high-voltage line765 kV at 1.6 km
federal grid data
Power cost (wholesale)3.092 c/kWh
wholesale market data
Flood designationzone X, not in a floodway
federal flood maps
Streamflow at nearest gage24,300 cfs
federal streamflow data
Estimated deliverable capacity
1,579 MW1,263 to 1,895 MW · limited by interconnection rights · 83% confidence
A screening estimate modeled from voltage, nameplate, and line data. Not a binding interconnection study.
Score breakdown
power dimension
Power availability
100
Interconnection
95
Transmission
92
Power cost
90
Reliability and carbon
73
Environmental
90
Water
100
Natural hazard
80
Climate and cooling
73
Fiber and latency
43
Incentives
30
Power gate: clears. Strong on every power dimension, so the gate passes this site through cleanly.
Diligence read
Advance to diligenceReuse · 1,579 MW deliverable
$11.3M / MW
Capex (benchmark)
$17.8B
Total build (modeled)
12 to 24 mo
Time to power
pending deal terms
IRR
Federal ITC: 30% on on-site energy property
State incentive: IL: data-center investment sales-tax exemption + credit
What could derail it: Incentives (30), Fiber and latency (43)

Capex, ITC, and build figures are labeled public-benchmark assumptions, not quotes. IRR is left uncomputed until real lease or PPA terms are supplied, revenue is never invented.

Live grid profile · MISO
wholesale market data
fossil 60.2%nuclear 14.7%renewable 17.5%
4.05 c/kWhday-ahead average
high volatility, spikes to 24.6 c/kWh
Regulatory signals · each source-linked
  • HIGH2026-06-24 · PJM region
    PJM Interconnection / AEP Appalachian + Indiana-Michigan transmission filing
  • MED2026-06-24 · MISO region
    MISO / AEP Indiana-Michigan transmission cost filing
  • MED2026-06-23 · National
    US sees record Q1 2026 energy-storage installations

Detected from federal dockets, legislative feeds, and trade press, refreshed nightly. Each links its public source in the tool.

Emerging sites · signal-detected leads
509 on the national watchlist
  • Franklin Farms 1&2planned gas
    Planned natural gas, online 2028 · Richland, LA
  • Seminolefreed capacity
    Canceled or postponed coal, interconnection may free up · Putnam, FL
  • Turney Energy Centerplanned gas
    Planned natural gas, online 2027 · Clinton, MO
  • Canalfreed capacity
    Canceled or postponed gas, interconnection may free up · Barnstable, MA
  • Castle Bluff Energy Centerplanned gas
    Planned natural gas, online 2027 · St Louis, MO

Found from federal generator inventories before they reach the main dataset, a freed interconnection or a planned plant is a reuse or co-location lead. The full list is in the tool.

That was one site, in full

The tool runs this on the national universe, and on your own pipeline.

  • Every powered site nationally, ranked and refreshable
  • Your own candidate sites, scored the same way
  • The full emerging-sites watchlist, not just five
  • Live grid and regulatory feeds, refreshed nightly